University La Lombarderie

01/12/2024

Benefits: As part of the restructuring of buildings on the science campus of the University of Nantes, the new BGT is integrated into the existing BGT. Her role is to activate backup information, concentrate the alarms and electrical counts of the different TDs as well as the generator. The GTB also ensures the supervision of the HVAC equipment: the 4 CVAs, the building’s substation, laboratory equipment (fume cupboards) and air conditioning cassettes through a Hitachi gateway.

Education • Nantes (44)

University La Lombarderie

Benefits: As part of the restructuring of buildings on the science campus of the University of Nantes, the new BGT is integrated into the existing BGT. Her role is to activate backup information, concentrate the alarms and electrical counts of the different TDs as well as the generator. The GTB also ensures the supervision of the HVAC equipment: the 4 CVAs, the building’s substation, laboratory equipment (fume cupboards) and air conditioning cassettes through a Hitachi gateway.

Cité Administrative Amiens

01/12/2023

Benefits : As part of a global public performance contract (MPGP), construction of the administrative city of the 21st century : a level 3 bio-sourced building and low carbon E2C1 which aims for the Passivhaus label. The GAB is a tool for : controlling energy, improving comfort, managing the flexibility of spaces, and managing BSOs. It ensures optimized management of the building and is responsible for energy commitment.

Offices • Amiens (80)

Cité Administrative Amiens

Benefits : As part of a global public performance contract (MPGP), construction of the administrative city of the 21st century : a level 3 bio-sourced building and low carbon E2C1 which aims for the Passivhaus label. The GAB is a tool for : controlling energy, improving comfort, managing the flexibility of spaces, and managing BSOs. It ensures optimized management of the building and is responsible for energy commitment.

Flaubert

01/05/2023

Benefits : As part of the construction of an office building in R+7, our services include : The computer pre-wiring Security and access control The Special Security Plan (PPMS) : Sound broadcasting for the PPMS and the relaunching of security. The GTB investor (technical alarms, counting, production and substation...) The management of technical installations, metering, alarm management, services and uses related to BOS for the « customer » party

Offices • Rouen (76)

Flaubert

Benefits : As part of the construction of an office building in R+7, our services include : The computer pre-wiring Security and access control The Special Security Plan (PPMS) : Sound broadcasting for the PPMS and the relaunching of security. The GTB investor (technical alarms, counting, production and substation...) The management of technical installations, metering, alarm management, services and uses related to BOS for the « customer » party

Saclay University

01/01/2023

Benefits : As part of a 25-year contract for the design/construction/operation/maintenance of a 90,000m2 real estate complex: the Biology Pharmacy Chemistry Cluster will include research laboratories, teaching spaces, scientific greenhouses, places of conviviality, technical premises, and a university restaurant. S3EB carried out the BOS, a tool for supervising the CFO, medical fluids, CVC, plumbing and the GSA (Supervision on IPad of animal facilities for researchers), and a monitoring tool at the heart of energy commitment.

Teaching • Orsay, Gif on Yvette (91)

Saclay University

Benefits : As part of a 25-year contract for the design/construction/operation/maintenance of a 90,000m2 real estate complex: the Biology Pharmacy Chemistry Cluster will include research laboratories, teaching spaces, scientific greenhouses, places of conviviality, technical premises, and a university restaurant. S3EB carried out the BOS, a tool for supervising the CFO, medical fluids, CVC, plumbing and the GSA (Supervision on IPad of animal facilities for researchers), and a monitoring tool at the heart of energy commitment.

Internat Kerichen

01/05/2022

Benefits : As part of the design and construction contract, which also includes technical operation and maintenance for 4 years after acceptance, S3EB is carrying out the construction of the future living and accommodation center of the school city of KERICHEN and its three high schools. The originality of this project is to integrate, within the same ensemble, three independent boarding schools that share common and shared spaces: entrance hall, music rooms and full-floor sports.

Education • Brest (29)

Internat Kerichen

Benefits : As part of the design and construction contract, which also includes technical operation and maintenance for 4 years after acceptance, S3EB is carrying out the construction of the future living and accommodation center of the school city of KERICHEN and its three high schools. The originality of this project is to integrate, within the same ensemble, three independent boarding schools that share common and shared spaces: entrance hall, music rooms and full-floor sports.

RHENA Clinic

01/01/2022

Initial benefits of 2017: GTB Lot, GTB coordination with the technical lots. Portal for access to the supervision of the HVAC, CFO, plumbing and generator technical batches. Supervision of fridges, freezers and blood banks throughout the clinic on IP network via analog interface / IPPOE. Amending works in 2018/2019: Evolution of the existing GTB as part of the extension of the clinic to create a cardiology and interventional radiology service (ICS cardiovascular institute). Amending works 2022: Evolution of the existing BMS as part of the extension of the clinic to create a scanner service

Health • Strasbourg (67)

RHENA Clinic

Initial benefits of 2017: GTB Lot, GTB coordination with the technical lots. Portal for access to the supervision of the HVAC, CFO, plumbing and generator technical batches. Supervision of fridges, freezers and blood banks throughout the clinic on IP network via analog interface / IPPOE. Amending works in 2018/2019: Evolution of the existing GTB as part of the extension of the clinic to create a cardiology and interventional radiology service (ICS cardiovascular institute). Amending works 2022: Evolution of the existing BMS as part of the extension of the clinic to create a scanner service